WaterTreatmentSourceWater treatment, filtration, dosing, wastewater, membranes, and environmental equipment for global industrial buyers.
Animal Manure Dehydrator Cow Dung Dewatering Machine/Solid Liquid Separator/Cow Animal Manure Chicke
Dissolved Air Flotation

Animal Manure Dehydrator Cow Dung Dewatering Mach | RFQ Sourcing Details

Dissolved Air Flotation · Quote on request

This is a product procurement detail page: check specs, images, category context and related sourcing paths before sending an RFQ.

Quote on request

Product specs

CategoryDissolved Air Flotation
Unitset
CategoryDissolved Air Flotation
AvailabilityInquiry required
Updated2026-05-26

Buyer's Digest

Use this page as a product-first sourcing checkpoint before sending an RFQ. Category: Dissolved Air Flotation. Confirm application fit, capacity, materials, destination, lead time and compliance requirements before comparing suppliers.

Original product description

cow dung drying machine/manure dewatering machine/cow dung manure dewatering machine with high quality PJEP solid-liquid separator is a machine designed for high-concentration sewage and non-squeezing places;dedicated for humus solids-blister manure (high bed type), pig farms, cattle farms, chicken farms, duck farms, etc.

Performance 1. 15 to 40 tons of sewage can be processed per hour. (The concentration of manure and water content are changeable) (Operation for 8 hours per day) The maximum processing capacity (solid) of the extruder is 2.5 cubic meters per hour. 2.

power: submersible pump (2.2KW)/ head: 8 meters/ extruder: 2.2KW/ water pump: 750W/ cleaning machine 65W;Detailed Photos Features 1.

The network-tube extrusion is designed for high-concentration sewage, such as blister manure (high-bed type), chicken farms, duck farms, etc., and its operation process can stably maintain a solid moisture content of 65%, which is better than a screw press dehydrator. 2.

Breaking through the technology of Europe, America and Japan, the water cutting net is 3-0.5m/m, the post-processing is easy, and the service life is long. 3. Gear-type reverse cleaning structure, no wire rope electrical parts and other consumables can be recycled. 4.

Automatic detection, start at full water level, filter, press dry, wash the screen in the middle, and fully-automatic operation for washing the screen and filtering when the machine stops operating.

Models&Specification specification Model A B C D E F inlet G Outlet I filtrate Extrusion Power Flushing Pump Power Driving nozzel motor power Capacity Lift pump power GY- DN80-DN100 DN125-DN150 DN40 2.2KW 0.75KW 65w × 1 25-40 ³ /H 2.2KW GY- DN50-DN80 DN100 DN40 2.2KW 0.75KW 25w × 1 12-20m ³ /H 0.75KW Company Profile Yangzhou Pujiang Environmental Protection Technology Co., Ltd.

locates in Yangzhou,which is very close to Shanghai, China. Pujiang has strong manufacturing capacity, first-class workshops and many processing facilities.

Pujiang always regards product quality as our life and we have established a complete process control and management system from product research and development, raw material procurement to manufacturing, and quality inspection. Pujiang has focused on producing environmental equipments including sludge t

Animal | Applications and Buyer Notes

Animal is organized as a sourcing-ready Dissolved Air Flotation reference. The page combines visible product or company data with structured procurement cues so buyers can compare application fit, specifications, quantity, quality requirements and lead-time qu

Applications

  • Initial shortlist building for related product or supplier options.
  • Specification and application fit review before bulk purchasing.
  • Category, keyword and detail-page comparison before sending an RFQ.

Key specifications

Category
Dissolved Air FlotationBased on visible page data; confirm exact value in the RFQ.
Unit
setBased on visible page data; confirm exact value in the RFQ.

Buyer tips

  • State quantity range and split-delivery needs before price comparison.
  • Add certification, material or inspection standards when they affect acceptance.
  • For time-sensitive projects, include target arrival date and destination.
  • For special applications, describe operating condition, installation environment and duty cycle.

FAQ

What should buyers confirm first?

Confirm application, specification, quantity, destination and lead-time requirements before comparing offers.

Can buyers inquire when specs are incomplete?

Yes. Add model, material, size, use case and inspection needs in the RFQ to make replies comparable.

How should this listing be evaluated?

Check title, category, specifications and related keywords against the actual sourcing requirement.

Source mix: ugc

Key specifications

CategoryDissolved Air Flotation
Unitset

Product sourcing keywords

These terms come from the title, visible copy and specifications, and link into matching aggregate pages.

Continue from this detail page into sourcing structure

These links connect the detail page back to category hubs, procurement aggregates and knowledge pages so new inventory is not isolated.

WaterTreatmentSource related sourcing paths

WaterTreatmentSource procurement phrases

WaterTreatmentSource related product samples