WaterTreatmentSourceWater treatment, filtration, dosing, wastewater, membranes, and environmental equipment for global industrial buyers.
Chinese Factory Price Screw Press Sludge Dewatering System for Waste Water Treatment
Sludge Dewatering

Chinese Factory Price Screw Press Sludge Dewateri | RFQ Sourcing Details

Sludge Dewatering · Quote on request

This is a product procurement detail page: check specs, images, category context and related sourcing paths before sending an RFQ.

Quote on request

Product specs

CategoryAir Source Heat Pumps
Unitset
CategorySludge Dewatering
CategorySludge Dewatering
AvailabilityInquiry required
Updated2026-05-26

Buyer's Digest

Use this page as a product-first sourcing checkpoint before sending an RFQ. Category: Sludge Dewatering. Confirm application fit, capacity, materials, destination, lead time and compliance requirements before comparing suppliers.

Original product description

screw press sludge dewatering system S crew press Sludge Dewatering Equipment is our main product. It is a new kind of volute multi-disc hydraulic sol id-liquid separation machine in wastewater treatment , adopting multi-disk structure.

Low rotation speed, energy-saving, non-clogging design, easy to operate, all these advantages make this dewatering press more and more popular around the world. And it can work 24h automatically, it saves labor cost. Compact and smart design saves the construction cost. Easy to maintain saves your maintenance cost.

Screw press can be used for sludge thickening and dewatering ,it is is usually used for sludge treatment after biological process and thickening prior to storage, digestion and further dewatering. In WWTP, sludge concentration is about 0.2%-2%. After thickening, the solid content reaches 5% to 9%.

Thus stable thickened sludge is provided for further dewatering equipment such as frame press and other machines. Also the dewatering efficiency and capacity are improved. Work principle : 1.

The main body of the dehydrator is composed of a fixed ring and a movable ring screw on top of each other, with a screw l shaft running through it to form a filtration device. The front section is the concentration section, and the rear section is the dehydration section. 2.

The filter gap formed between the fixed ring and the movable ring, as well as the pitch of the spiral shaft, gradually decreases from the concentration section to the dehydration section.

The rotation of the 3 spiral shafts not only pushes the sludge from the concentration section to the dehydration section, but also continuously drives the traveling ring to clean the filter gap and prevent blockage.

After gravity concentration in the concentration section, the sludge is transported to the dehydration section.

As it advances, it gradually decreases with the filter gap and pitch, and under the blocking effect of the back pressure plate, generates great internal pressure, continuously reducing its volume to achieve full dehydration As screw press starts running, sludge flows into the filter cylinder and moves forward to sludge cake outlet under the thrust from screwshaft.

The whole filter cylinder is composed of fixed rings, moving rings ans shaft. The first two sections are thickening zone, last two are dewatering zone, The space between screw blades gets more and

Chinese | Applications and Buyer Notes

Chinese is organized as a sourcing-ready Sludge Dewatering reference. The page combines visible product or company data with structured procurement cues so buyers can compare application fit, specifications, quantity, quality requirements and lead-time questio

Applications

  • Initial shortlist building for related product or supplier options.
  • Specification and application fit review before bulk purchasing.
  • Category, keyword and detail-page comparison before sending an RFQ.

Key specifications

Category
Sludge DewateringBased on visible page data; confirm exact value in the RFQ.
Unit
setBased on visible page data; confirm exact value in the RFQ.

Buyer tips

  • State quantity range and split-delivery needs before price comparison.
  • Add certification, material or inspection standards when they affect acceptance.
  • For time-sensitive projects, include target arrival date and destination.
  • For special applications, describe operating condition, installation environment and duty cycle.

FAQ

What should buyers confirm first?

Confirm application, specification, quantity, destination and lead-time requirements before comparing offers.

Can buyers inquire when specs are incomplete?

Yes. Add model, material, size, use case and inspection needs in the RFQ to make replies comparable.

How should this listing be evaluated?

Check title, category, specifications and related keywords against the actual sourcing requirement.

Source mix: ugc

Key specifications

CategoryAir Source Heat Pumps
Unitset

Product sourcing keywords

These terms come from the title, visible copy and specifications, and link into matching aggregate pages.

Continue from this detail page into sourcing structure

These links connect the detail page back to category hubs, procurement aggregates and knowledge pages so new inventory is not isolated.

WaterTreatmentSource related sourcing paths

WaterTreatmentSource procurement phrases

WaterTreatmentSource related product samples