WaterTreatmentSourceWater treatment, filtration, dosing, wastewater, membranes, and environmental equipment for global industrial buyers.
Stainless Steel Top Loading Electric Water Dispenser with Hot/Cold Options
Channel Facilities

Stainless Steel Top Loading Electric Water Dispenser with Hot/Cold Options

This detail page turns one product record into a narrower sourcing decision with clearer category fit, adjacent routes and RFQ-ready context.

Quote on request

Stainless | Applications and Buyer Notes

Stainless is organized as a sourcing-ready Channel Facilities reference. The page combines visible product or company data with structured procurement cues so buyers can compare application fit, specifications, quantity, quality requirements and lead-time ques

Applications

  • Initial shortlist building for related product or supplier options.
  • Specification and application fit review before bulk purchasing.
  • Category, keyword and detail-page comparison before sending an RFQ.

Key specifications

Category
Wastewater Treatment EquipmentBased on visible page data; confirm exact value in the RFQ.
Brand
Ningbo Aofukang InBased on visible page data; confirm exact value in the RFQ.
Unit
setBased on visible page data; confirm exact value in the RFQ.
Application
Food and beverage processingBased on visible page data; confirm exact value in the RFQ.
Cabinet
normal normal refrigeratorBased on visible page data; confirm exact value in the RFQ.
Capacity
0.8lBased on visible page data; confirm exact value in the RFQ.
Certification
CE, CB, RoHSBased on visible page data; confirm exact value in the RFQ.
Color
BlackBased on visible page data; confirm exact value in the RFQ.

Buyer tips

  • State quantity range and split-delivery needs before price comparison.
  • Add certification, material or inspection standards when they affect acceptance.
  • For time-sensitive projects, include target arrival date and destination.
  • For special applications, describe operating condition, installation environment and duty cycle.

FAQ

What should buyers confirm first?

Confirm application, specification, quantity, destination and lead-time requirements before comparing offers.

Can buyers inquire when specs are incomplete?

Yes. Add model, material, size, use case and inspection needs in the RFQ to make replies comparable.

How should this listing be evaluated?

Check title, category, specifications and related keywords against the actual sourcing requirement.

Source mix: ugc

Product sourcing profile

CategoryChannel Facilities
Inquiry workflowPlatform RFQ workflow
AvailabilityInquiry required
Updated2026-05-05

Product introduction

Home Consumer Electronics Water Treatment Equipment Water Dispenser Stainless Steel Top Loading Electric Water Dispenser with Hot/Cold Options US$ pieces US$ pieces US$ + pieces Start Order Request Send Inquiry Chat Now ProducWaterTreatmentSource curates RFQ-led product discovery for buyers looking for wastewater treatment equipment options. The page is organized around specification review, application fit, and inquiry-ready comparison.When evaluating this product, buyers should confirm application fit, required performance range, installation environment, lead time, documentation, and whether the supplier can support OEM or project quotations. Current vertical focus: water treatment, filtration, dosing, wastewater, membranes, and environmental equipment sourcing and rfq-ready export supply platform.watertreatmentexportair

Selection and RFQ points

Review material fit, application context, alternatives and RFQ detail before comparing related product paths.

Material fit Wastewater Treatment Equipment

Confirm material, size, finish, tolerance and processing needs before price comparison.

Application fit application, operating environment and usage frequency

Add the target application and operating context so related products can be compared correctly.

Alternative path Abs Material

Use nearby materials, equipment types or category pages when this record is close but not exact.

RFQ detail Quantity, destination, timing

Include quantity, destination, target delivery window, packaging and any technical constraints.

Key specifications

CategoryWastewater Treatment Equipment
BrandNingbo Aofukang In
Unitset
ApplicationFood and beverage processing
Cabinetnormal normal refrigerator
Capacity0.8l
CategoryWastewater Treatment Equipment
CertificationCE, CB, RoHS
ColorBlack
Cooling Capacity0.8L/H
Cooling MethodElectric Ooling
Cooling power75W 80W 90W
CustomizationAvailable
Dimensions (L x W x H (Inches)33*34*98cm
Feature Highlightsstainless steel, digital, automatic
FunctionHot & Cold Cabinet normal
Heat Power550watt
Heating capacity5.0L/H-95
Housing MaterialStainless steel
InstallationStand
KeywordsElectric Drinking Water Dispenser
Loading Qty.273PCS/20'GP
Matched Termswater, treatment, export, air
MaterialABS Material
ModelAFK-1126W Colour black
Model NO.AFK-1126W
OriginZhejiang, China
PackingCarton Box
Power1126w
Power (W)220
Power SourceElectric
Product NameWater Drinking Fountains
Product TitleStainless Steel Top Loading Electric Water Dispenser with Hot/Cold Options
Refund policyClaim a refund if your order doesn't ship, is missing, or arrives with product issues.
Secure paymentsEvery payment you make on Made-China.com is protected by the platform.
Shipping Cost.
TrademarkAOFUK
Transport PackageStandard Cardboard Box
TypeHot & Cold
Voltage240v
Voltage &F requence220-240V / 110-127V 50/60Hz Materials ABS Plastic & Metal
Voltage (V)550
Warranty1 Year
Way of CoolingCompressor Cooling
cooling capacity0.8L/H-15) Heating capacity 5.0L/H-95
cooling power75w heating power 550W
heating power550W 550W 550W
packingcartons Place of Product Zhejiang Province,China

Keyword evidence

Only terms with visible evidence in this listing are shown here.

Product sourcing keywords

These terms come from the title, visible copy and specifications, and link into matching aggregate pages.

Related keyword paths

Grouped by the product keyword that generated the related path.

SOURCING DECISION BRIEF

Stainless Steel Top Loading Electric Water Dispenser with Hot/Cold Options sourcing decision brief

This detail page turns one product record into a narrower sourcing decision with clearer category fit, adjacent routes and RFQ-ready context.

Category
Wastewater Treatment Equipment
Price status
Quote on request
Inquiry model
Structured product RFQ with quantity, destination and technical requirements.
Availability
Confirm by inquiry
Sourcing lens
Product detail to shortlist decision
Primary compare
Category, Brand, Unit
Record focus
Stainless Steel Top Loading Electric Water Dispenser With Hot/cold Options
Category focus
Channel Facilities
Buyer checklist
  • Category fit: Confirm whether the product belongs to the right category and nearby application path before outreach.
  • Specification depth: Review the visible specifications and convert missing fields into a clearer RFQ requirement set.
  • Route expansion: Use adjacent category, solution and procurement routes before settling on one detail page.
How should buyers use this detail page?

Use the detail page as a product-fit checkpoint. Confirm category placement, visible specifications and adjacent sourcing paths before sending an RFQ.

What should buyers compare first?

Compare the visible specifications, category fit and the nearest application or solution routes before asking for supplier options.

WaterTreatmentSource related sourcing paths

WaterTreatmentSource procurement phrases

WaterTreatmentSource project-fit checks

Application Confirm Application before comparing offers or moving the inquiry forward.
Country Confirm Country before comparing offers or moving the inquiry forward.
Capacity Confirm Capacity before comparing offers or moving the inquiry forward.
Material Confirm Material before comparing offers or moving the inquiry forward.
Application route Use Application to compare adjacent options instead of relying on one broad title match.
Country route Use Country to compare adjacent options instead of relying on one broad title match.

WaterTreatmentSource related product samples

Procurement notes

If visible specifications are still thin, add model, material, interface, quantity, application fit, destination and target lead time before comparing quotes.

Next sourcing actions